The project entailed the upgrading of an existing gravel D2910 road to surface road and is approximately 3.3 km in length and stormwater drainage.
The project scope entailed the following:
- Upgrading of an existing 3,32km gravel access road to tar.
- Surfacing with a 30mm asphalt overlay.
- Construction of a paved sidewalk using 60mm interlocking bricks.